Tags:The head of Krasnoyarsk
Such meetings of the head of Krasnoyarsk will be held during the summer, the most active period of renovation and landscaping.
A series of departures from the Sverdlovsk region has started. Natalia Firyulina, Chairman of the Krasnoyarsk City Council of Deputies, took part in the event.
The first point was the Fabulous Square. Landscaping is carried out under the federal program "Creating a comfortable urban environment". Last year, over 20,000 Krasnoyarsk residents voted for the renovation of the space.
A pedestrian zone made of asphalt and paving stones, street lighting and a video surveillance system will be installed in the park, 17 trees and four types of shrubs will be planted. Canopies with swings, art objects, children's sports complexes and themed play areas, including the scientific playground "Forest School", will be installed. The contractor carries out the excavation of the territory, dismantling work, and installs lighting.
Then the head of Krasnoyarsk assessed how the work is being carried out on Koltseva Street. According to the residents' appeal to Sergey Vereshchagin at an open meeting, an additional MSW collection site with a compartment for bulky waste is being created there. Illegal garages are being demolished on the spot, and the driveway will also be repaired.
On the avenue named after the newspaper "Krasnoyarsk Worker" Sergey Vereshchagin was informed about the progress of the improvement of the backup road in the area from the Bridge Square to house No. 157. Work on the 1,550-meter site is underway in preparation for the 400th anniversary of Krasnoyarsk.
"The roadway and parking lots will be brought to a standard condition, new pedestrian pavement and lighting will be equipped with the transfer of communications underground, accessibility for low-mobility categories will be ensured. There is a residential area nearby, so there is a large flow of transport and people here," said Roman Zuzenkov, head of the technical supervision department at MCU UDIB.
Pedestrian crossings are also planned, including one in the area of house No. 195. In addition, stairs will be repaired, urns and benches will be installed, and trees and shrubs will be planted.
"The landscaping of the frontage road of the avenue named after the newspaper "Krasnoyarsk Worker" is also in full swing. Admittedly, she was in a bad way. We hope that reasonable solutions will be implemented here and additional landscaping will appear," Natalia Firyulina said. – A very good theme park should be located near the KHMZ. The contractor is working competently to create a common space."
In addition, the head of Krasnoyarsk checked how the renovation is going according to the federal program of kindergarten No. 60 in the lane. Medical. The contractor performs the installation of the roof, porches and blind area, repair of floors and floors, waterproofing of the foundation, plastering. It is planned to improve the surrounding area, upgrade the equipment of the food store, purchase furniture, toys, office equipment and educational tools.
"The format of the "District Route" trips involves regular checks throughout the summer season. Attention will be paid to projects for the development of social infrastructure, preparations for the 400th anniversary of the city, as well as verification of the fulfillment of tasks set following open meetings with residents. An important point is compliance with technology, quality and deadlines. Responsible services that act as work customers need to organize strict control over each facility," said Sergey Vereshchagin.