in progress
As part of Krasnoyarsk's preparations for the 400th anniversary, a large-scale modernization of the educational infrastructure is underway, including the construction of new schools and kindergartens, as well as major repairs to existing institutions. These measures are aimed at improving the quality of education, solving the problem of shortage of places and creating a modern educational environment.
4 schools and 1 kindergarten have been completed and put into operation. 4 new schools and 1 kindergarten are under construction. Major repairs are planned in 5 kindergartens and 4 schools.
Construction of schools and kindergartens:
Put into operation:
1) school in 3 MKR-n w/r "Solnechny";
2) the school in the MKR-n "Metrostroitel";
3) school in the VII MKR-n "Airport";
4) a school in the Zheleznodorozhny district on Omskaya St.;
5) kindergarten in the VI MKR-n w/r "Pokrovsky".
Commissioning in 2026-2028:
1) School No. 1 in the "Quiet Dawns" district;
2) school in the railway station "Michurinsky";
3) the school in the Agrouniversitet district;
4) school in 5 MKR-n w/r "Solnechny";
5) kindergarten for 270 places in the "Serebryany" district within the boundaries of Lesoparkovaya - ave. Svobodny Lane Cozy – Palmnaya street.
Major repairs of kindergartens:
1) DS No. 206 (54a Svobodny Ave.);
2) DS No. 110 (Kornetova str., 12a);
3) DS No. 282 (Ustinovich str., 7a);
4) DS No. 60 (Medical Lane, 2a);
5) DS No. 292 (Telman str., 7a).
Major renovation of schools:
1) School No. 46 (64 Shchorsa St.);
2) School No. 18 (Urvantseva str., 10a);
3) School No. 62 (ul. 60 let Oktyabrya, 21);
4) School No. 85 (Bykovsky str., 4).
Implementation period: 2024-2028
in progress
Construction of a highway from Gribolevskaya St. to Sokolovskaya St. in the direction of the future residential area of Solontsy-2 through Afanasy Tavakov St. to the move to the Northern Highway
in development
Construction of an all-terrain bicycle crossing over the Yenisei River from the Zelenaya Roscha railway station on Tatyshev Island